Spools of Cable
To tie down spools you will need dunnage, chains, nails and a hammer. In your load assignment it will tell you how many rows of spools you are to pick up, times the number of spools by two and that will be the number of dunnage you will need to bring with you to help tie down the load.
As they load, place a piece of dunnage in front of the row of spools and a piece of dunnage in back of the row of spools. The shipper supplies the chocks needed to nail to the deck in front and back of the dunnage. Next, feed 2 chains through the eye of the spools and have one chain pull to the front of the spool and 1 chain pull to the back of the spool. Repeat for each row.
Wire Bundles
Each wire bundle need to be attached
Source: HERE
Comments